25 Oct

Always eager to deeply involve clients in our project, Qamar Construction fostered an atmosphere of teamwork and collaboration early on with Gas Station owners and staff. Cooperation between Owner and Qamar Construction was very proactive, with weekly meetings, scheduled for every Thursday- even during the aluminum stud phase of the project. The most innovative feature of the clinic is the integration of all the systems into construction phases.

“Qamar Construction worked with us from the day we had our plans and helped us plan the construction process. We are grateful for the timely finish of the project, without any reduction in quality”
-Owner, Lufkin Truck Stop.

Qamar construction successfully completed the new construction of the Lufkin Gas Station and C-store in 2017. The project was built on a 5 acre lot. Construction included a detailed interior buildout of the C-store / Truck stop according to floor plans and a total buildout of the gas station (with 15 gas pump stations), including the facade, concrete paving, gas tank storage and the and the rest of the space was used for concrete paving for trucks and vehicles. The project is located in Lufkin, TX.

Share